The Village of Galena and its partners are advancing improvements to parks, streets, parking, sidewalks, stormwater infrastructure, and public facilities. Here is what residents can expect in 2026 and beyond!

01  /  4 PROJECTS

Street, Parking & Sidewalk Improvements

Target: Thanksgiving 2026

Holmes Street

McB and Sands Decker design-build team will complete widening, resurfacing, restriping and repairs as needed. Completion is planned by Thanksgiving 2026.

FundingVillage of Galena

Work byMcB and Sands Decker

Target: November 15, 2026

Walnut Street

South Walnut Street parking improvements plan showing the relocated guardrail, new parking spaces and new sidewalk

Improvements include street resurfacing, replacement of a stormwater catch basin, sidewalk upgrades and expanded, paved and striped parking.

North Walnut: the parking area is being paved and striped, adding several parking spaces along with a new ADA-accessible sidewalk.

South Walnut: the guardrail will be relocated to allow properly designed, paved and striped parking spaces, and the street will be widened with a new sidewalk. Completion is planned by November 15, 2026.

FundingVillage of Galena

Work byMcB and Sands Decker (South Walnut)

Through November 15, 2026

Columbus Street

Columbus Street improvements plan showing heavy-duty pavement, a raised center-block crosswalk and new striping

Chemcote/CTL will install heavy-duty pavement, construct a raised center-block crosswalk and add new striping. Work is scheduled to begin in October, with completion by November 15, 2026.

Work byChemcote/CTL

Village-wide

Village-Wide Asphalt Repairs

Damaged pavement areas throughout the Village will be repaired.

02  /  3 PROJECTS

Park Improvements

Phase II underway

Miller Park Pavilion

Phase I was completed earlier in 2026. Phase II, including restrooms, electrical work, concrete, and stonework, is underway, with completion planned by Thanksgiving 2026.

Phase III, including painting, trim work, signage and landscaping, is planned for 2028.

FundingVillage of Galena

Target: November 2026

Miller Park Trail

The trail will be widened and resurfaced with completion planned for November 2026.

FundingPreservation Parks of Delaware County

Target: End of November 2026

Miller Park Parking Lot

Chemcote/CTL will pave the driveway, expand and pave the existing parking area and add striping. Completion is planned for the end of November this year.

FundingVillage of Galena

Work byChemcote/CTL

03  /  2 PROJECTS

Accessibility Improvements

Sidewalks installed

Village Square Sidewalk & Crosswalk

Sidewalks were installed around the perimeter of the Village Square, with a new crosswalk and a traffic calming bump-out on the southwest corner of the Square, improving ADA accessibility.

Work byT Crete

Target: December 2026

Village Hall Entrance

T Crete and Lawn Masters will construct a new ADA-accessible entrance to Village Hall. Completion is planned for December 2026.

FundingVillage of Galena

Work byT Crete and Lawn Masters

Thank you for your patience as these community improvements move forward.

Schedules are subject to weather, material availability, and construction conditions. Watch for future Village updates about timing and access.